Using a utility knife cut them off at the bottom of the adhesive strip.
How to starter course shingles over existing 3 tab roof.
This process starts with a 5 inch starter strip fit along the eaves and set against the second course of existing shingles see figure 2 16.
Rip cut the starter strip or starter pieces so that they butt up against the second course of existing shingles and are even with the front edge of the existing roofing.
Starter shingles are the initial shingle products installed on the roof just before the first course of the finish shingles which will comprise the visible parts of the roof.
Damaged shingles should be removed to check the decking for problems.
To prepare the tabs and lay the starter course shorten the first starter shingle by 6 inches or about a half of one tab.
Damaged decking will need to be repaired before you can install any new shingles.
Following the manufacturer s directions.
Attach with nails along the top edge of the strip.
Every roof has to start somewhere and that somewhere is at the appropriately named starter shingle also called starter strip.
Cut and install shingles.
If you are using a power nailer drive nails by squeezing the trigger and bouncing the nailer s tip onto the shingle.
Cut and install shingles rip cut the shingles for the first course so they butt up against the third course of existing shingles and are even with the front edge of the starter course.
Place the top of each starter shingle firmly against.
If you are making your own starter shingles cut the tabs off for the starter course bottom row of shingles.
Step 3 cover the old shingles.
Use a starter strip or cut pieces for a starter course.
To make your own use the flat solid part of the shingles and a heavy duty utility knife to cut pieces that are approximately 5 inches wide.
If laying three tab shingles over three tab shingles it is important to nest the new shingles against the old to create a flat surface as friedman elaborates just below.
To begin installing the first shingles on your roof cut off the three tabs on the shingle.
Tools you will need for roofing from amazon bostitch coil nailer https amzn to 2u1v8e2 shingle remover https amzn to 2fzu5wf roof snake https amzn to 2.
Drive a nail at one end first then drive the others.
Their tab slots should not line up with the tab slots of the starter course if there are any.
Nail the shingles just above the tab slots.
Place the glue strip at and all along the drip edge and the rake edges as well.
This should leave you with about 1 2 of the shingle left.