Of the shingle tabs where the bottom edge of the tab meets the top of the cutout.
How to tarp a shingle roof.
Continue along the length of the ridge line.
Lay the tarp across the roof so that at least 4 feet 1 2 m lies on the sloped part of your roof on each side known as the peak.
Keep this up until you reach the other end of the peak.
Screw the 2 by 4 directly into the roof to secure it.
It eliminates the need for hammers wood stripes nails bricks and sandbags when trying to cover the damaged roof area.
Extend the top edge of the tarp over the roof.
Your last shingle is an exposed shingle.
Partially unroll your tarp to cover the damaged area from the roof s eaves to peak.
Place the 2 4 against the roof along the rake to prevent water collection.
Place the first shingle end flush to the edge of the roof.
Starting at a corner drive a galvanized roofing nail into the strip and into the roof sheathing.
This tarp mitigates the water damage while protecting the property.
Make sure to tighten the tarp as much as possible to the structure.
Tear off the old shingles.
The 2 by 4 should be about 2 feet longer than the tarp width.
It can easily be installed by a single person providing consumers with a quick easy and effective solution in the installation of a tarp.
Let the rest of the tarp hang off the lower border of the roof that overhangs the wall known as the eave.
Ensure your tarp is properly positioned and weighed down with 2 x 4 wooden planks before securing it to your roof.
Nail each side of the shingle to each side of the ridge just below the shingles self sealing strip.
Then fold the excess tarp under a few rotations for a tight clean fit.
You ll need a tarp with grommets so you can tie it off and drive nails in or around your soffits to secure it.
Lay more 2 by 4s on either side of the tarp and attach those as well for a tight well secured water barrier.
Make sure to expose 5 in.
There should be an additional 4 feet of tarp on every side.
Lay the tarp out flat over the roof.
Your 2 4 should be two feet longer than the width of your tarp.
For a damage free method that doesn t require patching you could cover the entire roof with plastic sheeting feed rope through the sheeting and stake it into the ground with tent supports.
Install the next shingle approximately 2 3 past the seal strip of the first shingle.
Your tarp must be fully sandwiched so it won t come loose in windy or stormy conditions.
These nails should be placed 12 to 18 apart.
Wrap your tarp around the board then secure the board to the roof with a screw.
Once this course is laid you can begin snapping horizontal chalk lines up the roof to ensure straight rows.
Use four roofing nails per shingle as indicated on package instructions six nails in high wind areas.
Use a sturdy extension ladder that extends at least 3 feet above the eaves to climb onto the roof and secure the bottom to the foundation and the top to the eaves or fascia so it doesn t move.